- Validity of the IOPP certificate checked kept ready for surveyor.
- Entry in ORB checked , sign of engineers and master as required
- All sludge disposal receipts to shore reception facilities to be attached with ORB.
- Calculate the sludge formation, which should not exceed the limits as given in marpol.
- Incinerating time, incinerated waste oil amount, remainder of waste oil in waste oil tank should be reasonable. ( If incinerator is fitted on board and approved / approval cert should be checked ).
- Incinerator kept ready for demonstration, such as heating of waste
oil tank, alarms, control and functional test, done prior to survey. ( If fitted on board )
- OWS working procedure should be known to all engineers ,OWS 15 ppm alarm , three way valve should be operational and presentable to surveyor , All required parts of OWS should be sealed.
- Section of discharge pipe removed and free from oil residues.
- ODM checked for 15-ppm alarm and automatic stopping.
- High-level alarms of sludge tank, waste oil tank and bilge holding tank checked.
- Spare filter for OWS must be kept onboard.
- USCG Notice posted near OWS and bilge pumping out station.
- ODMCS in good working condition ( If fitted ).
- Pumping and piping systems are in good working condition.
- SOPEP plan is updated and endorsed.
- SOPEP inventory should be up to date.
- Keep all BDN ( bunker delivery notes ) ready for surveyor.
- Sounding records of all bunker tanks.
NO POLLUTION TO OUR SEA - SAFE AND SOUND JOB OF A SEAFARER